Басты бет > Хабар > Penalty for damage to electrical networks

Penalty for damage to electrical networks

SI «Territorial Department of the Committee of nuclear and energy supervision and control of the Ministry of energy of the Republic of Kazakhstan in the city of Shymkent» (hereinafter – the Department) informs that in the manifacture of earthworks in the security zone of electric networks must comply with the requirements of the Rules for the establishment of security zones of electric networks and special conditions for the use of land located within the boundaries of such zones, approved by order of the Minister of energy of the Republic of Kazakhstan dated September 28, 2017 №330 (hereinafter – Rule)
According to point 35 of the Rules, individuals and legal persons excavation work in the buffer zone, upon detection of cable not specified in the technical documentation for the production work, stop the work, take measures to ensure the security and integrity of the cable and report it to the nearest regional transmission organization, to which belongs the electric network, or the local Executive bodies.
Also, for violations of this act, article 305 of the Code of the Republic of Kazakhstan «On administrative infractions» provides administrative liability.
In this regard, on the basis of the above, in order to avoid violation of SI «Territorial Department of the Committee of nuclear and energy supervision and control of the Ministry of energy of the Republic of Kazakhstan in the city of Shymkent» recommends strict compliance with legal acts in the field of electricity.